Cooperative, two mountain passes

Know what we have before the weather asks.

A working paper for the commission improvement plan: what changes at Fife, Mossvale and the Ridge yard before next storm season.

Intake: current-state discovery
Fleet units with any condition telemetry today
0 of 155
Intake: current-state discovery
Average time to first crew on site
94 minutes
The Gaps

What the binder and the radio cannot tell you anymore

None of this is a judgment on the crews. It is what three service centers and a wall calendar were ever built to do. The commission's request just made the gap visible.

01 · GAP
Condition lives in a shift-end memory

A truck's condition is whatever a lineman happens to mention at the end of a shift.

02 · GAP
Inspections are paper in three binders

Dielectric tests and boom inspections are logged on paper, one binder per yard.

03 · GAP
Storm dispatch sends whoever is closest

Crews are radioed to storms by location, with no read on whether a unit is fit to go.

04 · GAP
Capital gets approved on age alone

The board approves fleet replacement on age and odometer, the only number anyone has.

Gap Analysis01

Condition lives in a shift-end memory

There is no path from a fault code on the dash to the shop that does not run through a person's twelve hour day. If the lineman forgets, the next signal is the truck failing to start or failing on the pass. Sam Ortlieb called this the entire absence of a process, not a slow one.

Recommended Approach
Continuous condition signal off the vehicle itself

Degradation shows up as a signal, not a memory. A fault reaches the shop the day it happens, not the day someone remembers to say it out loud.

0 of 155
Units reporting condition today
Source: Intake: current-state discovery
The Approach

What a written improvement plan actually requires

Four capabilities, in the order the commission and the board will ask about them. None require touching hours of service.

Degradation signal on every unit

Component condition is read continuously off the vehicle, bucket trucks and digger derricks and support units alike, before failure.

Impact
Faults reach the shop the day they occur
No dependence on a lineman's memory
Inspection record as system of record

Dielectric testing and boom inspections are logged against the unit once, replacing three separate paper binders at three yards.

Impact
One record, queryable by unit and date
Survives a retirement, not tied to a person
Fitness-to-deploy at dispatch

Storm dispatch sees which units are fit to go before a crew is sent, alongside the location picture it already has.

Impact
Fewer units sent that should not go
A defensible answer when the board asks
Per-unit cost and condition ledger

Capital review works from a per-vehicle record instead of age and odometer, with a baseline agreed before anything is measured.

Impact
Replacement argued from evidence, not birthday
A number the CFO can defend publicly
Day in the Life

Before and after, at the yard

Three roles, the same storm season. What changes is not the radio, it is what the radio call is backed by.

Ray Pellham
Three yards, 155 units, one binder each
When he retires, a real part of my maintenance program retires with him.
What keeps this stuck
Inspection history exists only on paper, split across three service centers.
A dielectric or boom record request means a call to the yard and a wait
Ray finds the right binder, or waits for whoever remembers where the page is filed.
Quarterly scans land on a shared drive nobody opens
The record exists but is not searchable by unit, date or inspection type.
Outcome: Two days and a phone call to produce one unit's record on request.
Where You Stand

What would the commission find today?

Six questions, about two minutes. Answer for the fleet as it runs today, not as you intend it to run.

6 questions. Under two minutes. Nothing is emailed to you.
The Value

Tied to the improvement plan the commission is waiting on

Four outcomes, mapped straight to what Della has to write down and be held to.

A defensible restoration figure
Fitness-to-deploy data behind the dispatch call gives Della a restoration time she can put in a rate filing and defend, not just report.
An inspection record, not a binder
Dielectric and boom history moves from three paper binders to one record, answering the commission before it has to ask twice.
Capital argued from evidence
Junie gets a per-unit cost and condition basis for board review instead of age and odometer, with a baseline and a review date fixed in advance.
A risk removed from one person's memory
What the retiring foreman carries in his head becomes a record that outlasts him, on the same trucks, without touching hours of service.
Why this fits a cooperative starting from zero
  • Nothing here touches the ELD or the hours of service record already in use.
  • A per-vehicle rollout means starting on a handful of units, not the whole fleet at once.
  • Governance questions on driver-level data get answered and put in writing before the union does, not after.
  • The improvement plan needs a measurement method and a review date, not a percentage borrowed from another fleet.
  • Trailers, buckets and digger derricks get the same instrumentation depth as the tractor, so the blind spot does not just move.